Title
of the Project.
Blood
Bank Management
INTRODUCTION:
The
project entitled Blood Bank Management is
a pilot project for new Blood bank to be start soon in the city. The management
planned this blood bank to operate on the next month. They have a big plan to
collect the blood from many different sources and distribute the same for the
needy. To manage all these they require full-fledged
software which will take care all of these.
PROJECT:
Blood
Bank Management is a software application to maintain day to day transactions
in a blood bank. This software help to register all the donors, Blood
collection details, blood issued details etc.
OBJECTIVE:
The main
objective of this application is to automate the complete operations of the
blood bank. They need maintain hundreds of thousands of records. Also searching
should be very faster so they can find required details instantly.
SCOPE:
This
application is built such a way that it should suits for all type of blood
banks in future. So every effort is taken to implement this project in this
blood bank, on successful implementation in this blood bank, we can target
other blood banks in the city.
Scope
This is of pilot project prepared for blood bank, once it is
successfully implemented, the same project can be implemented in all the blood
banks, to manage their day to day activities.
Scope of the Blood Bank
Management
The scope of Blood Bank
Management includes:-
1. Single application
system to manage all Donor details, Recipient Details, Collection, Issue, Stock,
and other details in the same application.
2. Used to display stock
as and when required. Admin can check the blood available stock.
3. The program works on
network so many people can work simultaneously.
4.The data secured using
password, so one cannot access the data easily, so we secure the user data.
5. All information
digitally stored so it is long lasting.
6.We can track all the
collection and issue of the blood.
2. Introduction and Objectives of the Project.
Existing
System
The Blood bank offers the following four
deposits:
·
Camp Conduct
·
Blood Collection
·
Blood Issue
·
Awareness camp
Main aim of the project is to manage all the
activities of the blood bank. It is mainly blood collection and Issue of the
blood. We also conducting the camps to build the general awareness and to
collect the blood at the camps.
Collection
from the Donor
Under this module we collect the blood from
the donor. Each bottle or pouch of the blood is marked properly and will be
stored in the refrigerator till which will be issued to the recipient.
The tasks implemented here are:
·
Create new Donor Account
·
Conduct camps to create awareness
and to collect the blood
·
Edit any donor information
·
Collect the blood from the donor
·
Generate daily reports,
particular account number’s report, report of transaction between the two dates
etc.
Problems of the
existing system
The problems faced
by the blood bank with the present system:
·
Maintenance of ledgers for each customer is
a cumbersome process and proves to be costly on the run.
·
stock maintenance of the blood bank becomes
difficult because each time any transaction is made it has to be updated in the
ledger manually.
·
Checking the stock as and when required is
difficult we can’t count all the bottles each time to know how much quantity of
the blood is available. And also each blood group.
·
If customer requests for any clarification
the person in charge has to search through the written records and fetch the
details regarding that particular customer, which is time consuming and
cumbersome.
·
All calculations are done manually;
therefore there is a high risk of error in calculation, leading to confusion
and chaos.
·
Maintenance of the ledgers occupy large
space
·
Security of the information maintained is
comparatively less.
Present
mode of working is based on manual system in which the all the information is
first received and then entered in the register. It is very difficult job and time consuming
also. Moreover, the existing system is also dependent on employees, if the
employees are absent; it leads to problem and affects the business performance.
Due
to large volume of data, a lot of complexities are involved in maintaining,
updating and retrieving selected information. Since old system is totally
maintained manually, some of the complexities involved in existing system are
as follows:-
1. Redundancy of data: - Due
to improper maintenance of data, inconsistency is there which leads to problem
like duplication of data.
2. Difficulty in updating the data:-Problem
of updating data in the existing system since everything is stored in registers
and files. It is very difficult and time consuming to update data.
3. Non-centralized data:-In
the existing system, data records are kept under file maintenance system, due
to this system the placement of the data is not at one particular place. This
results in more confusion and more consumption of time for the proper
maintenance of records.
4. Delay in retrieving information: -Retrieving
information is quite time-consuming process because of large volume of data, if
it is required to locate a particular record a large number of registers have
to be scanned.
5. Problem for keeping the data: -As
the data is voluminous, more space is required to store it. Also everything is
stored on papers. This type of storage is more prone to damage with time and
due to other accidental factors.
6. No integration or relation between
the data: - Present system does not support any type
of data integrity.
7.
Not proper retrieval of information: - It is very difficult to
get data information in the existing system if any information is required for
any specific purpose.
The proposed
system
The proposed system is a software application
program to manage the co-operative bank day to day work. The software will be
developed in Visual Basic 2010 as front end and MSSQL Server as a backend.
The aim of proposed system is to develop a system
of improved facilities. The proposed system can overcome all the limitations of
the existing system. The system provides proper security and reduces the manual
work.
ADVANTAGES OF THE PROPOSED SYSTEM
The
system is very simple in design and to implement. The system requires very low
system resources and the system will work in almost all configurations. It has
got following features
• Security
of data.
• Ensure
data accuracy’s.
• Proper
control of the higher officials.
• Reduce
the damages of the machines.
• Minimize
manual data entry.
• Minimum
time needed for the various processing.
• Greater
efficiency.
• Better
service.
• User
friendliness and interactive.
• Minimum
time required.
The
proposed system is also less dependent on employees. It works without any help
of employees. The whole software is automatic. The entire software developed
with user friendly interface.
OBJECTIVE OF NEW
SYSTEM
The
objective is to design a system that can integrate all the above features in a
single system, so that it can be easy to use .The new system should have all
the records and files of the old system in a comprehensively linked manner so
that whenever we want to retrieve some information, it can be done in an efficient
manner.
The
system should be a one-step shop solution where all the different jobs
regarding the various operations and functions in the centers can be done on a
single window with least hassle. That is, the new system should be able to do
work in the least amount of time and with much more efficiency and
effectiveness than the existing system.
The
designing aspects of new system should be aimed towards basing all the data
fields and data records in a single database, from where any operation on the data
or data retrieval can be done easily. It should be designed in such a way that
only the required information is displayed when asked for. Not like the manual
system where one has to search in hard copy files to look for a particular
record.
It should remove, if not
all majority of the problems that exists in the old system. Also it should be
compatible, easy to understand and easy to modify.
The
aim would be to remove as many problems as possible from the existing system
and design the new system in such a manner that it looks a very comprehensive
approach to the stated objectives. The organization structure of the old system
should be clearly understood so that the objectives it aims to achieve can be
designed.
There
should be complete interaction between the various sub-systems of the main
system so that there can be efficient functioning of the system. Every
component of the system should be able to interact with other components
through a common interface. There should be such an interaction interface, that
if one component wants the output from other sub-system then it can do so
freely and without hindrance.
Also
all sub-systems should be interdependent on each other and also independent, it
means that whenever some sub-system wants some information from other
sub-system, it can do so without any problem, also when a system functions
independently then it does not have to wait for data to be processed. All the
sub-systems should be performing the designed operations on the given data in a
comprehensive manner so that all of them are aimed towards achieving a common
goal.
The main objectives
of the new system are mentioned below:-
1. Fast and Efficient: -
As compared to existing system, in new system the user can get the information
fast, easily and efficiently from the software.
2. Reliable and accurate: -As
in new system, the information is stored and processed in computers so that
data will be more reliable and accurate.
3. Centralized Data:-In
the existing system, data records are kept under file maintenance system due to
this system the placement of the data is not at one particular place. But in
new system, each and every record is maintained on computer, which leads to the
centralization of data.
4. Non Redundant Information: -
As in proposed system data is maintained on the computers so inconsistency does
not occur which will never lead to problem like duplication of data.
5. Easy to Access: -As
compared to existing system, in new system the users can easily and efficiently
accesses the information from the computer.
3.
Project Category : RDBMS Application
RDBMSs have been a common choice for
the storage of information in new databases used for financial records,
manufacturing and logistical information, personnel data, and other
applications since the 1980s. Relational databases have often replaced legacy
hierarchical databases and network databases because they are easier to
understand and use. However, relational databases have received unsuccessful
challenge attempts by object database management systems in the 1980s and 1990s
(which were introduced trying to address the so-called object-relational
impedance mismatch between relational databases and object-oriented application
programs) and also by XML database management systems in the 1990s. Despite
such attempts, RDBMSs keep most of the market share, which has also grown over
the years.
The application we are developing is
the of the type RDBMS Project.
4.
Tools / Platform, Hardware and Software Requirement specifications.
Hardware
and Software requirement
Hardware Requirement
Processor : Intel I5 2.0 GHz or more
RAM : 2 GB or More
Hard
disk : 5 GB free hard disk space
Monitor : 18” LED monitor
Keyboard : Normal
or Multimedia
Mouse : Compatible mouse
Software
Requirement
Front End : Visual
Basic 2010
Back End : MS SQL
Server
Operation System : Windows
10
Or
Windows
8
You can buy this project from us.
We also develop projects in your required language.
Please contact us for more details
google location map
https://goo.gl/maps/1FYWaiRHdiRsjL6Y6
website
https://www.highblix.com/
Whatsapp
9243101428
we are located at
HighBlix / Raksha Infotech
No 826, 9th Main, Hampinagar
Bangalore, Karnataka, India. Pin - 560104.
Land Mark (Opposite to National Public School, Hampinagar Main BusStop)
IEEE- Electronics - Final Uear Projects : Python, PHP, Java, C#, VB, Android
for BE, BTech, ME, MTech, BCA, MCA, BSc, IGNOU
=================================================
No comments:
Post a Comment